Yixin Section
-
04
2025
-
2025/04 Chunghwa Telecom Internet Cable
-
2025/04 Earthwork out of topsoil
-
2025/04 Earthwork out of topsoil
-
2025/04 Earthwork out of topsoil sprinkle water
-
2025/04 Earthwork out of topsoil sprinkle water
-
2025/04 Base geological improvement
-
2025/04 Base geological improvement
-
2025/04 Base geological improvement
-
2025/04 Base geological improvement
-
2025/04 Base geological improvement
-
2025/04 Base geological improvement
-
2025/04 Base aerial shot
-
-
05
2025
-
2025/05 Earthwork out of topsoil
-
2025/05 Earthwork out of topsoil
-
2025/05 Earthwork out of topsoil
-
2025/05 Retaining wall compression beam construction
-
2025/05 Retaining wall construction
-
2025/05 Retaining wall construction
-
2025/05 Retaining wall reinforcement tying
-
2025/05 Water truck cleaning road
-
-
06
2025
-
2025/06 Taipower Temporary Power
-
2025/06 Taipower Temporary Power
-
2025/06 Taipower Temporary Power
-
2025/06 Secondary earthwork excavation
-
2025/06 Secondary earthwork excavation
-
2025/06 Secondary earthwork excavation
-
2025/06 Base Aerial Photography
-
2025/06 Safety Observation Measurement
-
2025/06 Retaining wall construction
-
2025/06 Water truck cleaning
-
-
07
2025
-
2025/07 Taipower temporary power supply configuration
-
2025/07 Secondary earthwork excavation
-
2025/07 Secondary earthwork excavation
-
2025/07 Secondary earthwork excavation
-
2025/07 Secondary earthwork excavation
-
2025/07 Taking photos from the base
-
2025/07 Safety observation measurement
-
2025/07 Safety observation measurement
-
-
08
2025
-
2025/08 Upper section retaining pile construction(13)
-
2025/08 Upper section retaining pile construction(15)
-
2025/08 Upper section retaining pile construction(2)
-
2025/08 Upper section retaining pile construction(8)
-
2025/08 Site aerial photos(3)
-
2025/08 Safety monitoring & surveying(2)
-
2025/08 Safety monitoring & surveying
-
-
09
2025
-
2025/09 Site aerial photos (3)
-
2025/09 Safety monitoring & surveying (2)
-
2025/09 Safety monitoring & surveying (3)
-
2025/09 Safety monitoring & surveying
-
2025/09 Retaining pile construction (10)
-
2025/09 Retaining pile construction (14)
-
2025/09 Retaining pile construction (8)
-
2025/09 Layout setting-out (2)
-