Humble House
-
09
2023
-
2023/09 Cold Cast-in-Place -
2023/09 Cold Cast-in-Place -
2023/09 Cold Cast-in-Place -
2023/09 Cold Cast-in-Place -
2023/09 Intermediate pile construction -
2023/09 Intermediate pile construction -
2023/09 earth excavation -
2023/09 Micro pile construction -
2023/09 Micro pile construction -
2023/09 Broken pavement
-
-
10
2023
-
2023/10 Cold Cast-in-Place -
2023/10 Cold Cast-in-Place -
2023/10 Cold Cast-in-Place -
2023/10 Cold Cast-in-Place -
2023/10 Cold Cast-in-Place -
2023/10 Earth excavation -
2023/10 Earth excavation -
2023/10 Earth excavation -
2023/10 Point well construction method -
2023/10 safety support implementation -
2023/10 Continuous wall inferior removal -
2023/10 Construction of GIP around excavation -
2023/10 Construction of GIP around excavation
-
-
11
2023
-
2023/11 Earth excavation -
2023/11 Earth excavation -
2023/11 Earth excavation -
2023/11 Earth excavation -
2023/11 Earth excavation -
2023/11 safety support implementation -
2023/11 safety support implementation -
2023/11 safety support implementation -
2023/11 Continuous wall inferior removal -
2023/11 Continuous wall inferior removal
-
-
12
2023
-
2023/12 FS steel bar binding -
2023/12 FS steel bar binding -
2023/12 FS steel bar binding -
2023/12 PC stakeout -
2023/12 PC stakeout -
2023/12 Earth excavation -
2023/12 Earth excavation -
2023/12 Earth excavation -
2023/12 Earth excavation -
2023/12 Base PC execution -
2023/12 Base PC execution -
2023/12 Base PC execution -
2023/12 safety support implementation -
2023/12 Continuous wall inferior removal -
2023/12 Continuous wall inferior removal -
2023/12 Continuous wall inferior removal -
2023/12 Continuous wall inferior removal
-
-
01
2024
-
2024/01 BS version template assembly -
2024/01 BS version template assembly -
2024/01 BS version water and electricity piping -
2024/01 BS version steel bar binding -
2024/01 BS version steel bar binding -
2024/01 FS steel bar binding -
2024/01 FS steel bar binding -
2024/01 FS steel bar binding -
2024/01 Floor beam formwork assembly -
2024/01 Floor beam formwork assembly -
2024/01 Floor beam formwork assembly -
2024/01 Floor beam formwork assembly -
2024/01 Ground beam grouting -
2024/01 Ground beam grouting -
2024/01 bottom grouting -
2024/01 bottom grouting -
2024/01 bottom grouting
-
-
02
2024
-
2024/02 B3F template assembly -
2024/02 B3F template assembly -
2024/02 B3F template assembly -
2024/02 B3F template assembly -
2024/02 B3F steel bar binding -
2024/02 B3F steel bar binding -
2024/02 B3F steel bar binding -
2024/02 B3F steel bar binding
-
-
03
2024
-
2024/03 B1F beam version steel bar binding -
2024/03 B1F beam version steel bar binding -
2024/03 B1F beam version steel bar binding -
2024/03 B2FL beam template assembly -
2024/03 B2FL beam version steel bar binding -
2024/03 B2FL beam version steel bar binding -
2024/03 B2F stakeout -
2024/03 B2F stakeout -
2024/03 B2F column wall steel bar binding -
2024/03 B2F column wall steel bar binding -
2024/03 B2F column wall steel bar binding
-
-
04
2024
-
2024/04 B1F template assembly -
2024/04 B1F template assembly -
2024/04 B1F template assembly -
2024/04 B1F template assembly -
2024/04 Tower crane installation -
2024/04 Tower crane installation -
2024/04 Safety support removal -
2024/04 Safety support removal
-
-
05
2024
-
2024/05 1FL beam plate formwork finishing -
2024/05 1FL beam template assembly -
2024/05 1FL beam template assembly -
2024/05 1FL beam version hydropower stakeout -
2024/05 1FL beam version water and electricity piping -
2024/05 1FL beam version water and electricity piping -
2024/05 1FL beam version steel bar binding -
2024/05 1FL beam version steel bar binding
-
-
06
2024
-
2024/06 1FL-RC -
2024/06 1FL-RC -
2024/06 1FL beam version water and electricity piping -
2024/06 1F vibration wall construction -
2024/06 1F vibration wall construction -
2024/06 1F stakeout -
2024/06 1F column wall water and electricity piping -
2024/06 1F column wall steel bar binding -
2024/06 1F column wall steel bar binding -
2024/06 column wall formwork assembly -
2024/06 column wall formwork assembly
-
-
07
2024
-
2024/07 1F column wall formwork assembly -
2024/07 1F column wall formwork assembly -
2024/07 1F column wall formwork assembly -
2024/07 1F column wall formwork assembly -
2024/07 2FL-RC -
2024/07 2FL-RC -
2024/07 2FL beam template assembly -
2024/07 2FL beam version steel bar binding -
2024/07 2FL beam version steel bar binding -
2024/07 2FL beam version steel bar binding -
2024/07 2F column wall water and electricity piping -
2024/07 2F column wall steel bar binding
-
-
08
2024
-
2024/08 2F column wall formwork assembly -
2024/08 3F column wall formwork assembly -
2024/08 3F column wall water and electricity piping -
2024/08 3F column wall water and electricity piping -
2024/08 3F column wall steel bar binding
-
-
09
2024
-
2024/09 4F column wall steel bar binding -
2024/09 5FL tamping construction -
2024/09 5FL beam version water and electricity piping -
2024/09 5FL beam version steel bar binding -
2024/09 5F vibration wall construction -
2024/09 5F column wall steel bar binding -
2024/09 Continuation of 5F column reinforcement
-
-
10
2024
-
2024/10 2F indoor hanging pipe feeding -
2024/10 5F column wall module erection -
2024/10 5F column wall module erection -
2024/10 6FL beam plate formwork standing -
2024/10 6FL beam version steel bar binding
-
-
11
2024
-
2024/11 2F indoor roof polishing -
2024/11 4F indoor cleaning -
2024/11 7FL beam version steel bar binding -
2024/11 7F column wall formwork assembly -
2024/11 7F scaffold climb -
2024/11 8FL template assembly -
2024/11 B1F ceiling soil approval
-
-
12
2024
-
2024/12 2F light partition construction -
2024/12 6F indoor rough definition -
2024/12 10FL steel beam version lashing -
2024/12 10F column wall steel bar binding -
2024/12 10F template assembly -
2024/12 10F template assembly
-
-
01
2025
-
2025/01 1FL layout water and electricity stakeout -
2025/01 11FL layout water and electricity piping -
2025/01 11FL layout steel bar binding -
2025/01 4F light partition construction -
2025/01 4F aluminum door and window installation -
2025/01 4F aluminum door and window installation -
2025/01 5F indoor water and electricity cable -
2025/01 5F light partition construction -
2025/01 7F mud for sticky strip application
-
-
02
2025
-
2025/02 11F column wall template assembly -
2025/02 11F column wall template assembly -
2025/02 12FL template assembly -
2025/02 12FL layout beam reinforcement binding -
2025/02 12FL layout beam reinforcement binding -
2025/02 12FL layout beam reinforcement binding -
2025/02 12FL layout water and electricity lofting -
2025/02 3F indoor mud painting -
2025/02 3F indoor mud painting -
2025/02 5F light partition sealing plate -
2025/02 5F light partition sealing plate -
2025/02 5F light partition sealing plate
-
-
03
2025
-
2025/03 10F compartment setting out project -
2025/03 13FL layout water and electricity piping -
2025/03 13FL steel bar binding -
2025/03 4F mud for painting -
2025/03 4F mud for painting -
2025/03 5F seam work -
2025/03 5F clay for sticky strips -
2025/03 5F aluminum door and window project
-
-
04
2025
-
2025/04 10F Indoor water and electricity -
2025/04 14F floor plan water and electricity -
2025/04 14F steel bar tying -
2025/04 15F template assembly -
2025/04 3F Light Partition -
2025/04 5F mud painting -
2025/04 5F mud painting -
2025/04 7F Mud Sticky Strip -
2025/04 7F Mud Sticky Strip -
2025/04 9F Aluminum Doors and Windows
-
-
05
2025
-
2025/05 10F水電電箱拉線01 -
2025/05 10F Mud Sticky Strip -
2025/05 10F compartment water and electricity cable -
2025/05 4F Bathroom Waterproofing -
2025/05 7F interior wall plastering -
2025/05 7F interior wall plastering -
2025/05 7F interior wall plastering -
2025/05 8F compartment cover -
2025/05 B1F cable duct construction
-
-
06
2025
-
2025/06 10F roof paint and soil -
2025/06 10F roof paint and soil -
2025/06 10F roof paint and soil -
2025/06 10F compartment water and electricity piping -
2025/06 10F compartment double-sided cover -
2025/06 14F Fire-fighting Pipe Lifting Construction -
2025/06 8F interior wall plastering -
2025/06 9F interior wall mud sticky strip -
2025/06 9F exterior wall plastering -
2025/06 B1F Basement Wireway
-
-
07
2025
-
2025/07 10F compartment cover -
2025/07 10F compartment grouting -
2025/07 11F interior mud strips -
2025/07 2F bathroom wall tiles -
2025/07 8F partition plastering -
2025/07 9F interior plastering -
2025/07 9F partition seam fiberglass mesh
-
-
08
2025
-
2025/08 10F interior masonry strip fixing 01 -
2025/08 11F light partition puttying 02 -
2025/08 11F light partition nailing 02 -
2025/08 13F aluminum doors & windows installation 01 -
2025/08 3F facing brick installation 02 -
2025/08 5F bathroom wall tile installation 05 -
2025/08 9F interior masonry plastering 02
-
-
09
2025
-
2025/09 12F Exterior Wall Plastering 01 -
2025/09 15F Fire Protection Piping Installation 02 -
2025/09 7F Bathroom Wall Tile Installation 03 -
2025/09 9F Brick Tile Installation 01 -
2025/09 9F Brick Tile Installation 02 -
2025/09 9F Brick Tile Installation 06
-
-
10
2025
-
2025/10 10F Bathroom Wall Tile Installation 02 -
2025/10 12F Exterior Masonry Plastering 04 -
2025/10 14F Door & Window Frame Caulking 02 -
2025/10 9F Exterior Wall Brick Tile Installation 01 -
2025/10 PRF Slab Rebar Tying 01 -
2025/10 R1F Exterior Wall Wiring for Lighting Plan 02 -
2025/10 R2F Formwork Assembly 02
-