Humble House
-
09
2023
-
2023/09 Cold Cast-in-Place
-
2023/09 Cold Cast-in-Place
-
2023/09 Cold Cast-in-Place
-
2023/09 Cold Cast-in-Place
-
2023/09 Intermediate pile construction
-
2023/09 Intermediate pile construction
-
2023/09 earth excavation
-
2023/09 Micro pile construction
-
2023/09 Micro pile construction
-
2023/09 Broken pavement
-
-
10
2023
-
2023/10 Cold Cast-in-Place
-
2023/10 Cold Cast-in-Place
-
2023/10 Cold Cast-in-Place
-
2023/10 Cold Cast-in-Place
-
2023/10 Cold Cast-in-Place
-
2023/10 Earth excavation
-
2023/10 Earth excavation
-
2023/10 Earth excavation
-
2023/10 Point well construction method
-
2023/10 safety support implementation
-
2023/10 Continuous wall inferior removal
-
2023/10 Construction of GIP around excavation
-
2023/10 Construction of GIP around excavation
-
-
11
2023
-
2023/11 Earth excavation
-
2023/11 Earth excavation
-
2023/11 Earth excavation
-
2023/11 Earth excavation
-
2023/11 Earth excavation
-
2023/11 safety support implementation
-
2023/11 safety support implementation
-
2023/11 safety support implementation
-
2023/11 Continuous wall inferior removal
-
2023/11 Continuous wall inferior removal
-
-
12
2023
-
2023/12 FS steel bar binding
-
2023/12 FS steel bar binding
-
2023/12 FS steel bar binding
-
2023/12 PC stakeout
-
2023/12 PC stakeout
-
2023/12 Earth excavation
-
2023/12 Earth excavation
-
2023/12 Earth excavation
-
2023/12 Earth excavation
-
2023/12 Base PC execution
-
2023/12 Base PC execution
-
2023/12 Base PC execution
-
2023/12 safety support implementation
-
2023/12 Continuous wall inferior removal
-
2023/12 Continuous wall inferior removal
-
2023/12 Continuous wall inferior removal
-
2023/12 Continuous wall inferior removal
-
-
01
2024
-
2024/01 BS version template assembly
-
2024/01 BS version template assembly
-
2024/01 BS version water and electricity piping
-
2024/01 BS version steel bar binding
-
2024/01 BS version steel bar binding
-
2024/01 FS steel bar binding
-
2024/01 FS steel bar binding
-
2024/01 FS steel bar binding
-
2024/01 Floor beam formwork assembly
-
2024/01 Floor beam formwork assembly
-
2024/01 Floor beam formwork assembly
-
2024/01 Floor beam formwork assembly
-
2024/01 Ground beam grouting
-
2024/01 Ground beam grouting
-
2024/01 bottom grouting
-
2024/01 bottom grouting
-
2024/01 bottom grouting
-
-
02
2024
-
2024/02 B3F template assembly
-
2024/02 B3F template assembly
-
2024/02 B3F template assembly
-
2024/02 B3F template assembly
-
2024/02 B3F steel bar binding
-
2024/02 B3F steel bar binding
-
2024/02 B3F steel bar binding
-
2024/02 B3F steel bar binding
-
-
03
2024
-
2024/03 B1F beam version steel bar binding
-
2024/03 B1F beam version steel bar binding
-
2024/03 B1F beam version steel bar binding
-
2024/03 B2FL beam template assembly
-
2024/03 B2FL beam version steel bar binding
-
2024/03 B2FL beam version steel bar binding
-
2024/03 B2F stakeout
-
2024/03 B2F stakeout
-
2024/03 B2F column wall steel bar binding
-
2024/03 B2F column wall steel bar binding
-
2024/03 B2F column wall steel bar binding
-
-
04
2024
-
2024/04 B1F template assembly
-
2024/04 B1F template assembly
-
2024/04 B1F template assembly
-
2024/04 B1F template assembly
-
2024/04 Tower crane installation
-
2024/04 Tower crane installation
-
2024/04 Safety support removal
-
2024/04 Safety support removal
-
-
05
2024
-
2024/05 1FL beam plate formwork finishing
-
2024/05 1FL beam template assembly
-
2024/05 1FL beam template assembly
-
2024/05 1FL beam version hydropower stakeout
-
2024/05 1FL beam version water and electricity piping
-
2024/05 1FL beam version water and electricity piping
-
2024/05 1FL beam version steel bar binding
-
2024/05 1FL beam version steel bar binding
-
-
06
2024
-
2024/06 1FL-RC
-
2024/06 1FL-RC
-
2024/06 1FL beam version water and electricity piping
-
2024/06 1F vibration wall construction
-
2024/06 1F vibration wall construction
-
2024/06 1F stakeout
-
2024/06 1F column wall water and electricity piping
-
2024/06 1F column wall steel bar binding
-
2024/06 1F column wall steel bar binding
-
2024/06 column wall formwork assembly
-
2024/06 column wall formwork assembly
-
-
07
2024
-
2024/07 1F column wall formwork assembly
-
2024/07 1F column wall formwork assembly
-
2024/07 1F column wall formwork assembly
-
2024/07 1F column wall formwork assembly
-
2024/07 2FL-RC
-
2024/07 2FL-RC
-
2024/07 2FL beam template assembly
-
2024/07 2FL beam version steel bar binding
-
2024/07 2FL beam version steel bar binding
-
2024/07 2FL beam version steel bar binding
-
2024/07 2F column wall water and electricity piping
-
2024/07 2F column wall steel bar binding
-
-
08
2024
-
2024/08 2F column wall formwork assembly
-
2024/08 3F column wall formwork assembly
-
2024/08 3F column wall water and electricity piping
-
2024/08 3F column wall water and electricity piping
-
2024/08 3F column wall steel bar binding
-
-
09
2024
-
2024/09 4F column wall steel bar binding
-
2024/09 5FL tamping construction
-
2024/09 5FL beam version water and electricity piping
-
2024/09 5FL beam version steel bar binding
-
2024/09 5F vibration wall construction
-
2024/09 5F column wall steel bar binding
-
2024/09 Continuation of 5F column reinforcement
-
-
10
2024
-
2024/10 2F indoor hanging pipe feeding
-
2024/10 5F column wall module erection
-
2024/10 5F column wall module erection
-
2024/10 6FL beam plate formwork standing
-
2024/10 6FL beam version steel bar binding
-
-
11
2024
-
2024/11 2F indoor roof polishing
-
2024/11 4F indoor cleaning
-
2024/11 7FL beam version steel bar binding
-
2024/11 7F column wall formwork assembly
-
2024/11 7F scaffold climb
-
2024/11 8FL template assembly
-
2024/11 B1F ceiling soil approval
-
-
12
2024
-
2024/12 2F light partition construction
-
2024/12 6F indoor rough definition
-
2024/12 10FL steel beam version lashing
-
2024/12 10F column wall steel bar binding
-
2024/12 10F template assembly
-
2024/12 10F template assembly
-