The Gorgeous Mansion
-
06
2024
-
2024/06 FS version decompression well buried
-
2024/06 Finally dug out the soil
-
-
07
2024
-
2024/07 B4F version water tank bottom plate and side wall grouting
-
-
08
2024
-
2024/08 B3F bottom plate grouting
-
-
09
2024
-
2024/09 B1F beam version assembly
-
2024/09 B2F column wall lashing
-
2024/09 B2F column wall lashing
-
2024/09 B2F version elevation device implementation
-
-
10
2024
-
2024/10 B1F beam version grouting
-
2024/10 B1F lane rack construction
-
-
01
2025
-
2025/01 1F half wall pouring
-
2025/01 1F top water and electricity stakeout
-
2025/01 1F top template assembly
-
2025/01 1F residential wall formwork assembly
-
2025/01 1F roof water and electricity piping
-
2025/01 1F roof pouring
-
2025/01 2F version of scaffolding installation
-
-
02
2025
-
2025/02 2 Floor roof water and electricity stakeout
-
2025/02 3FL grouting
-
2025/02 3rd floor wall reinforcement binding
-
2025/02 3 Floor roof slab construction
-
2025/02 3 Floor roof water and electricity stakeout
-
2025/02 3rd floor sealing double-sided mold
-
2025/02 3rd floor sealing double-sided mold
-
2025/02 3 Floor beam and slab assembly
-
-
03
2025
-
2025/03 4th floor grouting
-
2025/03 5 floor template finalization
-
2025/03 5th floor water and electricity piping
-
2025/03 5 Floor grouting column reinforcement cleaning
-
2025/03 3
-
2025/03 5 Floor column wall single-sided formwork assembly
-
2025/03 5 floor grouting
-
2025/03 6 Floor Architect Survey
-
2025/03 Stone cutting on the second underground floor
-
-
04
2025
-
2025/04 Scaffolding lifting
-
2025/04 6F coupler construction
-
2025/04 Taking photos from the base
-
2025/04 20250412-7F梁版綁紮
-
2025/04 South side pavement land leveling
-
2025/04 7F beam slab grouting
-
2025/04 Scaffolding construction on the first floor of Building A
-
2025/04 Underground elevator hall hanging wire
-
2025/04 Polishing of the underground two-ping roof
-
2025/04 The mud on the side of the second underground beam is used as the base
-
-
05
2025
-
2025/05 8F column reinforcement binding
-
2025/05 8F single-sided module
-
2025/05 8F single-sided module
-
2025/05 The ground is covered with mud
-
2025/05 9F version beam reinforcement binding
-
2025/05 9F version beam reinforcement binding
-
2025/05 9F version water and electricity piping
-
2025/05 9F version water and electricity piping
-
2025/05 9F version pouring
-
2025/05 9F version pouring
-
2025/05 9F Scaffolding Construction
-
2025/05 The ground is covered with mud
-
2025/05 Connector torque test
-
-
07
2025
-
2025/07 10F roof slab pouring operation
-
2025/07 6F exterior wall tile feed
-
2025/07 10F column wall connector construction
-
2025/07 Light compartment skeleton hanging material
-
2025/07 RF beam reinforcement binding
-
2025/07 Construction of light partition frame on 3F of Building A
-
2025/07 RF version hanging formwork construction
-
2025/07 Building A 4F light partition frame construction
-
2025/07 RF version water immersion maintenance
-
-
08
2025
-
2025/08 Building A & B RF roof column & wall concrete casting(3)
-
2025/08 Building A & B RF roof column & wall concrete casting(2)
-
2025/08 Building A 2F light partition grouting
-
2025/08 Building A 5F light partition single-sided board installation
-
2025/08 Building A PRF ring beam formwork installation
-
2025/08 Building A RF inner ring beam supplementary formwork support
-
2025/08 Building C 4F light partition steel plate reinforcement behind washbasin
-
2025/08 Building D & E 3F exterior wall window frame waterproofing
-
2025/08 Building D & E 4F window frame joint sealing
-
2025/08 Building E 4F light partition double-sided board installation
-
2025/08 Site aerial photos
-
2025/08 Generator room foundation construction
-