Future Lifestyle
-
03
2024
-
2024/03 Groundbreaking ceremony layou
-
2024/03 Groundbreaking ceremony layou
-
2024/03 Groundbreaking ceremony
-
2024/03 Groundbreaking ceremony
-
-
04
2024
-
2024/04 Peripheral pile construction
-
2024/04 Peripheral pile construction
-
2024/04 Peripheral pile construction
-
-
05
2024
-
2024/05 The installation of the middle platform piles
-
2024/05 First layer of earth excavation
-
2024/05 First layer of earth excavation
-
2024/05 The first layer of horizontal support
-
2024/05 First layer of horizontal support installation
-
-
06
2024
-
2024/06 The second layer of horizontal support
-
2024/06 Excavation of the second layer of earth
-
2024/06 Excavation of the second layer of earth
-
2024/06 The second layer of horizontal support
-
2024/06 The second layer of horizontal support
-
-
07
2024
-
2024/07 Fifth layer of earth excavation
-
2024/07 Fifth layer of earth excavation
-
2024/07 Fourth layer of earthwork excavation
-
2024/07 Fourth layer of earthwork excavation
-
2024/07 The fourth layer of lining
-
2024/07 Excavation of the third layer of earth
-
2024/07 The fifth layer of earthwork excavation
-
-
08
2024
-
2024/08 FS floor beam formwork assembly
-
2024/08 FS steel bar inspection
-
2024/08 FS steel bar inspection
-
2024/08 FS steel bar inspection
-
2024/08 FS steel bar binding
-
2024/08 FS steel bar binding
-
2024/08 PC concrete pouring
-
-
09
2024
-
2024/09 B4F Column Wall Beam Version Stakeout Inspection
-
2024/09 B4F column wall module erection
-
2024/09 B4F column wall module
-
2024/09 B4F roof beam plate formwork inspection
-
2024/09 B4F top beam plate module erection
-
2024/09 B4F top beam plate module erection
-
2024/09 B4F roof beam reinforcement binding
-
2024/09 B4F top version water and electricity stakeout
-
2024/09 B4F top version grouting
-
2024/09 B4F top version grouting
-
-
10
2024
-
2024/10 B2F column wall module erection
-
2024/10 B2F column bar continuation
-
2024/10 B2F column bar continuation
-
2024/10 B2F top beam plate module erection
-
2024/10 B2F top beam plate module erection
-
2024/10 B2F top beam plate module erection
-
2024/10 B3F column wall module erection
-
2024/10 B3F column wall module erection
-
2024/10 B3F top version beam plate module erection
-
2024/10 B3F top plate beam plate is spray painted before adding iron length
-
2024/10 B3F top beam plate reinforcement inspection independent inspection
-
2024/10 B3F top beam plate reinforcement inspection independent inspection
-
2024/10 B3F top beam plate reinforcement inspection independent inspection
-
2024/10 B3F roof beam reinforcement binding
-
2024/10 B3F roof beam reinforcement binding
-
2024/10 B3F top version grouting
-
2024/10 B3F top version grouting
-
2024/10 Removal of the second layer of safety supports
-
-
11
2024
-
2024/11 B1F column reinforcement continuation
-
2024/11 1FL beam plate module stand
-
2024/11 1FL beam version hydropower stakeout
-
2024/11 1FL beam version hydropower stakeout
-
2024/11 1FL beam plate formwork cleaning
-
2024/11 1FL beam reinforcement tying
-
2024/11 1FL beam reinforcement tying
-
2024/11 1FL beam reinforcement tying
-
2024/11 1FL beam reinforcement tying
-
2024/11 1FL beam reinforcement tying
-
2024/11 1FL beam reinforcement tying
-
2024/11 B1F column reinforcement continuation
-
2024/11 1FL beam reinforcement tying
-
2024/11 1FL version of tendon binding
-
2024/11 1FL version of tendon binding
-
2024/11 1FL version of tendon binding
-
2024/11 1FL layout cleaning
-
2024/11 1FL layout grouting
-
2024/11 1FL layout grouting sample
-
2024/11 1FL layout grouting sample
-
2024/11 B1F column wall module stand
-
2024/11 B1F column wall module stand
-
2024/11 B1F column wall module stand
-
2024/11 1FL beam plate module stand
-
2024/11 1FL beam plate module stand
-
2024/11 1FL beam plate module stand
-
2024/11 Driveway Grouting
-
-
12
2024
-
2024/12 B1F column reinforcement continuation
-
2024/12 1FL beam plate module stand
-
2024/12 1FL beam version hydropower stakeout
-
2024/12 1FL beam version hydropower stakeout
-
2024/12 1FL beam plate formwork cleaning
-
2024/12 1FL beam reinforcement tying
-
2024/12 1FL beam reinforcement tying
-
2024/12 1FL beam reinforcement tying
-
2024/12 1FL beam reinforcement tying
-
2024/12 1FL beam reinforcement tying
-
2024/12 1FL beam reinforcement tying
-
2024/12 B1F column reinforcement continuation
-
2024/12 1FL beam reinforcement tying
-
2024/12 1FL version of tendon binding
-
2024/12 1FL version of tendon binding
-
2024/12 1FL version of tendon binding
-
2024/12 1FL layout cleaning
-
2024/12 1FL layout grouting
-
2024/12 1FL layout grouting sample
-
2024/12 1FL layout grouting sample
-
2024/12 B1F column wall module stand
-
2024/12 B1F column wall module stand
-
2024/12 B1F column wall module stand
-
2024/12 1FL beam plate module stand
-
2024/12 1FL beam plate module stand
-
2024/12 1FL beam plate module stand
-
2024/12 Driveway Grouting
-