Future Lifestyle
-
03
2024
-
2024/03 Groundbreaking ceremony layou -
2024/03 Groundbreaking ceremony layou -
2024/03 Groundbreaking ceremony -
2024/03 Groundbreaking ceremony
-
-
04
2024
-
2024/04 Peripheral pile construction -
2024/04 Peripheral pile construction -
2024/04 Peripheral pile construction
-
-
05
2024
-
2024/05 The installation of the middle platform piles -
2024/05 First layer of earth excavation -
2024/05 First layer of earth excavation -
2024/05 The first layer of horizontal support -
2024/05 First layer of horizontal support installation
-
-
06
2024
-
2024/06 The second layer of horizontal support -
2024/06 Excavation of the second layer of earth -
2024/06 Excavation of the second layer of earth -
2024/06 The second layer of horizontal support -
2024/06 The second layer of horizontal support
-
-
07
2024
-
2024/07 Fifth layer of earth excavation -
2024/07 Fifth layer of earth excavation -
2024/07 Fourth layer of earthwork excavation -
2024/07 Fourth layer of earthwork excavation -
2024/07 The fourth layer of lining -
2024/07 Excavation of the third layer of earth -
2024/07 The fifth layer of earthwork excavation
-
-
08
2024
-
2024/08 FS floor beam formwork assembly -
2024/08 FS steel bar inspection -
2024/08 FS steel bar inspection -
2024/08 FS steel bar inspection -
2024/08 FS steel bar binding -
2024/08 FS steel bar binding -
2024/08 PC concrete pouring
-
-
09
2024
-
2024/09 B4F Column Wall Beam Version Stakeout Inspection -
2024/09 B4F column wall module erection -
2024/09 B4F column wall module -
2024/09 B4F roof beam plate formwork inspection -
2024/09 B4F top beam plate module erection -
2024/09 B4F top beam plate module erection -
2024/09 B4F roof beam reinforcement binding -
2024/09 B4F top version water and electricity stakeout -
2024/09 B4F top version grouting -
2024/09 B4F top version grouting
-
-
10
2024
-
2024/10 B2F column wall module erection -
2024/10 B2F column bar continuation -
2024/10 B2F column bar continuation -
2024/10 B2F top beam plate module erection -
2024/10 B2F top beam plate module erection -
2024/10 B2F top beam plate module erection -
2024/10 B3F column wall module erection -
2024/10 B3F column wall module erection -
2024/10 B3F top version beam plate module erection -
2024/10 B3F top plate beam plate is spray painted before adding iron length -
2024/10 B3F top beam plate reinforcement inspection independent inspection -
2024/10 B3F top beam plate reinforcement inspection independent inspection -
2024/10 B3F top beam plate reinforcement inspection independent inspection -
2024/10 B3F roof beam reinforcement binding -
2024/10 B3F roof beam reinforcement binding -
2024/10 B3F top version grouting -
2024/10 B3F top version grouting -
2024/10 Removal of the second layer of safety supports
-
-
11
2024
-
2024/11 B1FL beam reinforcement tying -
2024/11 B1FL version grouting -
2024/11 B1F column wall beam version lofting -
2024/11 B1F column wall beam version lofting -
2024/11 B1F column wall beam version lofting -
2024/11 Removal of the first layer of safety support -
2024/11 B1F column wall reinforcement binding -
2024/11 B1F column wall reinforcement binding -
2024/11 B1F column wall reinforcement binding -
2024/11 B1F column wall reinforcement binding -
2024/11 B1F column wall reinforcement binding -
2024/11 B1F column wall reinforcement binding -
2024/11 B1F column wall module stand -
2024/11 B1F column wall module stand -
2024/11 B1F half wall grouting -
2024/11 B1F half wall grouting -
2024/11 B1FL beam reinforcement tying -
2024/11 Peripheral pile removal -
2024/11 Peripheral pile removal -
2024/11 B1FL beam reinforcement tying -
2024/11 B1FL beam reinforcement tying -
2024/11 B1FL version grouting -
2024/11 B1FL version grouting -
2024/11 B1FL version grouting
-
-
12
2024
-
2024/12 B1F column reinforcement continuation -
2024/12 1FL beam plate module stand -
2024/12 1FL beam version hydropower stakeout -
2024/12 1FL beam version hydropower stakeout -
2024/12 1FL beam plate formwork cleaning -
2024/12 1FL beam reinforcement tying -
2024/12 1FL beam reinforcement tying -
2024/12 1FL beam reinforcement tying -
2024/12 1FL beam reinforcement tying -
2024/12 1FL beam reinforcement tying -
2024/12 1FL beam reinforcement tying -
2024/12 B1F column reinforcement continuation -
2024/12 1FL beam reinforcement tying -
2024/12 1FL version of tendon binding -
2024/12 1FL version of tendon binding -
2024/12 1FL version of tendon binding -
2024/12 1FL layout cleaning -
2024/12 1FL layout grouting -
2024/12 1FL layout grouting sample -
2024/12 1FL layout grouting sample -
2024/12 B1F column wall module stand -
2024/12 B1F column wall module stand -
2024/12 B1F column wall module stand -
2024/12 1FL beam plate module stand -
2024/12 1FL beam plate module stand -
2024/12 1FL beam plate module stand -
2024/12 Driveway Grouting
-
-
01
2025
-
2025/01 1F column wall module erection -
2025/01 1F column wall module erection -
2025/01 1F wall reinforcement binding -
2025/01 1F wall reinforcement binding -
2025/01 1F scaffolding erection -
2025/01 1F scaffolding erection -
2025/01 1MF column wall module stand -
2025/01 1MF column wall module stand -
2025/01 1MF column wall module stand -
2025/01 1MF beam grouting operation -
2025/01 1MF beam grouting operation -
2025/01 1MF beam version module stand -
2025/01 1MF beam reinforcement tying -
2025/01 1MF beam reinforcement tying -
2025/01 1MF beam version module stand -
2025/01 1MF template support inspection -
2025/01 1MF template support inspection -
2025/01 2FL beam version module stand -
2025/01 2FL beam version module stand -
2025/01 2FL version module stand
-
-
02
2025
-
2025/02 2FL beam reinforcement binding -
2025/02 2FL floor slab inspection -
2025/02 2FL floor grouting -
2025/02 2FL floor grouting -
2025/02 2F scaffolding assembly -
2025/02 2F scaffolding assembly -
2025/02 2F column reinforcement continuation -
2025/02 2F column reinforcement continuation -
2025/02 2F column wall formwork assembly -
2025/02 2F column wall formwork assembly -
2025/02 2F column wall formwork assembly -
2025/02 2FL beam reinforcement binding -
2025/02 2F wall reinforcement binding -
2025/02 2F wall reinforcement binding -
2025/02 3FL beam plate module erection -
2025/02 3FL beam plate module erection -
2025/02 3FL beam plate module erection -
2025/02 3FL layout water and electricity stakeout -
2025/02 3FL layout water and electricity stakeout -
2025/02 3FL beam reinforcement binding -
2025/02 2FL water and electricity piping -
2025/02 2FL version of tendon binding -
2025/02 2FL version of tendon binding
-
-
03
2025
-
2025/03 3F scaffold assembly -
2025/03 4FL beam reinforcement binding -
2025/03 4FL layout grouting -
2025/03 4FL layout grouting -
2025/03 4FL layout grouting -
2025/03 4F column reinforcement continuation -
2025/03 4F column wall module stand -
2025/03 3F column wall module erection -
2025/03 4F wall reinforcement binding -
2025/03 4F wall reinforcement binding -
2025/03 5FL beam plate module stand -
2025/03 5FL beam plate module stand -
2025/03 5FL beam plate module stand -
2025/03 4FL beam version module stand -
2025/03 4FL version module -
2025/03 4FL version module -
2025/03 4FL version module -
2025/03 4FL beam reinforcement binding -
2025/03 4FL beam reinforcement binding
-
-
04
2025
-
2025/04 5F column reinforcement connection -
2025/04 6FL beam and slab formwork assembly -
2025/04 6FL beam and slab formwork assembly -
2025/04 6FL template laying -
2025/04 6FL Grouting -
2025/04 6F column reinforcement connection -
2025/04 6F column reinforcement connection -
2025/04 6F wall module -
2025/04 6F wall module -
2025/04 6F wall reinforcement binding -
2025/04 7FL beam reinforcement binding -
2025/04 7FL beam reinforcement binding -
2025/04 7FL template laying -
2025/04 7FL template laying -
2025/04 7FL template laying
-
-
05
2025
-
2025/05 7F column wall template assembly -
2025/05 8FL version RC -
2025/05 8FL version template assembly -
2025/05 8F column reinforcement binding -
2025/05 8F column reinforcement connection -
2025/05 8F wall module -
2025/05 9FL beam and slab formwork assembly -
2025/05 9FL beam and slab formwork assembly -
2025/05 Basement roof soil -
2025/05 Basement mud basement
-
-
06
2025
-
2025/06 10FL Grouting -
2025/06 10F column wall water and electricity piping -
2025/06 10F beam formwork assembly -
2025/06 2F gypsum brick construction -
2025/06 2F gypsum brick construction -
2025/06 AB Building 2F Gypsum Brick Construction -
2025/06 AB Building 2F Gypsum Brick Construction -
2025/06 Aluminum doors and windows installation in Building A -
2025/06 Building B 2F Standing Window B8.B7.B6
-
-
07
2025
-
2025/07 12FL column reinforcement connection -
2025/07 12FL beam template laying -
2025/07 12FL beam template laying -
2025/07 12FL water and electricity piping -
2025/07 1F indoor partition line -
2025/07 2nd floor interior wall plastering -
2025/07 2nd floor embedded joints -
2025/07 2nd floor mud work -
2025/07 2nd floor mud work -
2025/07 Gypsum brick construction on the 5th floor of Building A -
2025/07 Gypsum brick construction on the 5th floor of Building B -
2025/07 grouting
-
-
08
2025
-
2025/08 13F scaffolding erection -
2025/08 13F concrete pouring -
2025/08 13F column rebar splicing -
2025/08 13F formwork installation -
2025/08 13F wall rebar tying -
2025/08 14F formwork dismantling -
2025/08 14F concrete pouring -
2025/08 14F rebar beam & slab material hoisting -
2025/08 14F scaffolding erection -
2025/08 2F–3F window waterproofing -
2025/08 2F flat ceiling puttying -
2025/08 7F partition works -
2025/08 Block A exterior wall strip reattachment
-
-
09
2025
-
2025/09 15F column & wall R1F beam & slab formwork erection -
2025/09 4F interior wall masonry plastering -
2025/09 8–9F gypsum block works -
2025/09 Building A & B 2F exterior wall masonry plastering -
2025/09 Building B 2F exterior wall masonry base plastering -
2025/09 Building B 2F bathroom water leakage test -
2025/09 Building B 3–4F bathroom water leakage test (2) -
2025/09 Building B 3–4F bathroom water leakage test -
2025/09 R1FL concrete pouring -
2025/09 R1FL layout setting-out & curing -
2025/09 R1FL rebar tying -
2025/09 R1F inspection -
2025/09 R1F MEP layout setting-out -
2025/09 R1F scaffolding erection -
2025/09 Beam-raising 1
-
-
10
2025
-
2025/10 Block AB R1F Formwork Assembly -
2025/10 Block AB R1F Rebar Tying -
2025/10 Block A 6F Interior Wall Plastering -
2025/10 Block B 11F Partition Work (2) -
2025/10 Block B 11F Partition Work -
2025/10 Block B 8–9F Window Frame Waterproofing -
2025/10 R2F Column Rebar Tying & Splicing -
2025/10 Hot & Cold Water Riser Installation -
2025/10 Wall Tile Installation -
2025/10 Interior Masonry Work -
2025/10 Shop Fixed Frame Installation -
2025/10 Waterstop Curb -
2025/10 Wall Putty Application -
2025/10 Partition Brick Cutting
-