Centre for the Future
-
05
2022
-
2022/05 Worship -
2022/05 Worship -
2022/05 Worship -
2022/05 Worship -
2022/05 Worship
-
-
06
2022
-
2022/06 casing -
2022/06 casing -
2022/06 casing -
2022/06 casing -
2022/06 casing -
2022/06 casing -
2022/06 casing
-
-
07
2022
-
2022/07 Earth excavation -
2022/07 Earth excavation -
2022/07 Earth excavation -
2022/07 Construction of anti-floating piles -
2022/07 Construction of anti-floating piles -
2022/07 Construction of anti-floating piles
-
-
08
2022
-
2022/08 Earth excavation -
2022/08 Earth excavation -
2022/08 Earth excavation -
2022/08 retaining wall -
2022/08 retaining wall -
2022/08 retaining wall -
2022/08 retaining wall -
2022/08 retaining wall
-
-
09
2022
-
2022/09 Earth excavation -
2022/09 Earth excavation -
2022/09 Earth excavation -
2022/09 retaining column -
2022/09 retaining column -
2022/09 retaining column -
2022/09 retaining column -
2022/09 retaining column
-
-
10
2022
-
2022/10 middle pile -
2022/10 middle pile -
2022/10 middle pile -
2022/10 middle pile -
2022/10 retaining column -
2022/10 retaining column -
2022/10 retaining column
-
-
11
2022
-
2022/11 Intermediate pile construction -
2022/11 Intermediate pile construction -
2022/11 Intermediate pile construction -
2022/11 First layer of horizontal support construction -
2022/11 First layer of horizontal support construction -
2022/11 First layer of horizontal support construction
-
-
12
2022
-
2022/12 Earth excavation -
2022/12 Earth excavation -
2022/12 Earth excavation -
2022/12 Second layer of horizontal support construction -
2022/12 Second layer of horizontal support construction -
2022/12 Second layer of horizontal support construction
-
-
01
2023
-
2023/01 Earth excavation -
2023/01 Earth excavation -
2023/01 Earth excavation -
2023/01 Earth excavation -
2023/01 The third layer of support construction -
2023/01 The third layer of support construction -
2023/01 The third layer of support construction
-
-
02
2023
-
2023/02 Lower retaining column -
2023/02 Lower retaining column -
2023/02 Lower retaining column -
2023/02 Lower retaining column -
2023/02 Earth excavation -
2023/02 Earth excavation -
2023/02 Earth excavation -
2023/02 Earth excavation
-
-
04
2023
-
2023/04 B3FL beam template assembly -
2023/04 B4FL version steel bar binding -
2023/04 B4FL version steel bar binding -
2023/04 B4F column wall formwork assembly -
2023/04 B4F column wall steel bar binding -
2023/04 B4F column wall steel bar binding
-
-
05
2023
-
2023/05 B3FL beam plate pouring -
2023/05 B3FL beam version steel bar binding -
2023/05 B3FL beam version steel bar binding -
2023/05 B3F column wall formwork assembly -
2023/05 B3F column wall steel bar binding -
2023/05 B3F beam template assembly
-
-
06
2023
-
2023/06 B1FL beam template assembly -
2023/06 B1FL beam version steel bar binding -
2023/06 B1FL beam version steel bar binding -
2023/06 B2F column wall formwork assembly -
2023/06 B2F column wall formwork assembly -
2023/06 B2F column wall steel bar binding
-
-
07
2023
-
2023/07 B1F column wall formwork assembly -
2023/07 B1F column wall steel bar binding -
2023/07 B1F column wall steel bar binding -
2023/07 B1F column wall steel bar binding -
2023/07 B1F column wall steel bar binding
-
-
08
2023
-
2023/08 1FL column wall steel bar binding -
2023/08 1FL tree hole hanging formwork -
2023/08 1FL water and electricity piping -
2023/08 1FL version of steel bar binding -
2023/08 1FL version of steel bar binding -
2023/08 1FL reserved steel bar binding -
2023/08 Panoramic photo of the base
-
-
09
2023
-
2023/09 1F column torsion test -
2023/09 1F column wall formwork assembly -
2023/09 1F column wall formwork assembly -
2023/09 1F column wall steel bar binding -
2023/09 Panoramic photo of the base
-
-
10
2023
-
2023/10 2FL water and electricity piping -
2023/10 2FL water and electricity piping -
2023/10 2FL steel bar binding -
2023/10 2FL steel bar binding -
2023/10 Aerial shot of the south side -
2023/10 Aerial shot of the east side
-
-
11
2023
-
2023/11 2F column wall formwork assembly -
2023/11 3FL beam template assembly -
2023/11 3F column wall formwork assembly -
2023/11 4FL beam template assembly -
2023/11 Aerial photos of the entire area
-
-
12
2023
-
2023/12 4F steel column wall binding -
2023/12 4F scaffold lifting outer frame -
2023/12 5FL beam version water and electricity piping -
2023/12 5FL elevation device installation -
2023/12 5F column wall formwork assembly -
2023/12 Panoramic photo of the base
-
-
01
2024
-
2024/01 7FL formwork beam assembly -
2024/01 7FL steel beam version lashing -
2024/01 7F formwork column and wall assembly -
2024/01 Polishing the roof of the second underground floor -
2024/01 Polishing the roof of the second underground floor -
2024/01 Polishing the roof of the second underground floor -
2024/01 Panoramic photo of the base
-
-
02
2024
-
2024/02 7F stair placement -
2024/02 8FL formwork beam assembly -
2024/02 8FL formwork beam assembly -
2024/02 8F water and electricity column wall piping -
2024/02 8F scaffold outer frame lifting frame -
2024/02 Panoramic photo of the base
-
-
03
2024
-
2024/03 10F column wall steel bar binding -
2024/03 2F indoor fire pipe installation -
2024/03 9FL RC pouring -
2024/03 9F vibration wall construction -
2024/03 Photos of the current appearance of the entire area -
2024/03 Aerial photos of the current situation in the area
-
-
04
2024
-
2024/04 11FL beam plate assembly and construction -
2024/04 11F column wall formwork assembly -
2024/04 12FL beam version steel bar binding -
2024/04 2F aluminum vertical window -
2024/04 3F clay production package -
2024/04 3F light compartment sealing single sided mold -
2024/04 3F aluminum vertical window -
2024/04 7F fire pipe installation
-
-
05
2024
-
2024/05 13FL formwork beam assembly -
2024/05 13FL water and electricity beam version stakeout -
2024/05 B3F primer brush -
2024/05 Connector torque test
-
-
06
2024
-
2024/06 14FL beam version steel bar binding -
2024/06 14F column main rib extension -
2024/06 2F light compartment for soil collection -
2024/06 4F light partition single-sided module stand -
2024/06 8F Indoor floor top soil batching
-
-
07
2024
-
2024/07 17FL beam version steel bar binding -
2024/07 17FL grouting front beam plate cleaning -
2024/07 4F metal door installation -
2024/07 5F light partition installation -
2024/07 8F aluminum window installation and execution -
2024/07 9F water and electricity indoor wiring -
2024/07 B1F wall plaster application
-
-
08
2024
-
2024/08 12F fire hanging pipe construction -
2024/08 18FL beam version steel bar binding -
2024/08 19F column wall formwork assembly -
2024/08 2F wall plaster work -
2024/08 5F light compartment for soil batching -
2024/08 5F aluminum window construction -
2024/08 5F door and window seams -
2024/08 7F metal door installation
-
-
09
2024
-
2024/09 11F aluminum window construction -
2024/09 15F fire hanging pipe -
2024/09 16F paint roof -
2024/09 21FL beam version steel bar binding -
2024/09 22FL beam version steel bar binding -
2024/09 5F interior mud work -
2024/09 7F light partition grouting -
2024/09 9F light partition installation
-
-
10
2024
-
2024/10 10F door and window seams -
2024/10 12F light partition single side -
2024/10 12F light compartment with double seal -
2024/10 12F light compartment with double seal -
2024/10 15F drainage pipe -
2024/10 22F column wall steel bar binding -
2024/10 4F interior mud work
-
2024/10 5F interior mud work
-
-
11
2024
-
2024/11 6F indoor mud work -
2024/11 10F light partition grouting -
2024/11 11F indoor mud work -
2024/11 11F door and window seams -
2024/11 14F light compartment with seal -
2024/11 14F metal door installation -
2024/11 16F indoor pull cord -
2024/11 3F indoor paint batching -
2024/11 3F bathroom tiles -
2024/11 5F bathroom waterproof -
2024/11 6F indoor mud work
-
-
12
2024
-
2024/12 11F indoor mud work -
2024/12 15F indoor mud work -
2024/12 17F metal door stand frame -
2024/12 20F aluminum window stand frame -
2024/12 24F roof paint and soil -
2024/12 6F indoor paint batching -
2024/12 7F exterior plaster work -
2024/12 7F indoor paint batching -
2024/12 7F kitchen tiles -
2024/12 8F light compartment for soil batching
-
-
01
2025
-
2025/01 10F Rectangular Tile -
2025/01 15F light compartment for soil batching -
2025/01 16F internal mud work -
2025/01 16F indoor mud work -
2025/01 16F light compartment for soil removal -
2025/01 7F Rectangular Tile -
2025/01 8F bathroom tiles -
2025/01 9F bathroom tiles
-
-
02
2025
-
2025/02 19F internal mud work -
2025/02 19F light partition sealing plate -
2025/02 19F light partition grouting -
2025/02 20F Clay Package -
2025/02 20F Clay Package -
2025/02 20F light compartment power distribution -
2025/02 20F door and window seams -
2025/02 22F light compartment vertical aggregate -
2025/02 22F light partition vertical aggregate -
2025/02 24F drainage pipe
-
-
03
2025
-
2025/03 14F Erding hanging tiles -
2025/03 15F indoor paint batch -
2025/03 19F Erding hanging seam -
2025/03 20F internal mud work -
2025/03 22F light partition construction -
2025/03 23F indoor power distribution -
2025/03 3F Bathroom Soft Bottom Installation -
2025/03 R1F Erding hanging tile
-
-
04
2025
-
2025/04 12F Interior paint finish -
2025/04 18F light partition plastering -
2025/04 18F light partition plastering -
2025/04 21F electrical box power distribution -
2025/04 22F window frame paper removal -
2025/04 22F light compartment grouting -
2025/04 24F indoor mud work -
2025/04 24F indoor mud work -
2025/04 4F bathroom soft bottom floor tile construction -
2025/04 5F 2-D hanging joint
-
-
05
2025
-
2025/05 10F Bathroom and kitchen wall tile caulking -
2025/05 13F Bathroom and kitchen wall tiles -
2025/05 13F soft bottom floor tile construction -
2025/05 17F paint finish -
2025/05 17F paint finish -
2025/05 23F interior mud work -
2025/05 23F aluminum window paper removal -
2025/05 24F 2-butylene caulking -
2025/05 24F stair brick construction -
2025/05 24F Metal Door Seam -
2025/05 5F ceiling aggregate application -
2025/05 9F soft bottom floor tile construction
-
-
06
2025
-
2025/06 15F Fire Pipe Construction -
2025/06 16F Elevator Test -
2025/06 18F soft bottom floor tile construction -
2025/06 21F iron railing construction -
2025/06 22F Glass Installation -
2025/06 23F Glass Installation -
2025/06 23F Iron railing construction -
2025/06 24F Iron Railing Construction -
2025/06 24F Iron Parts Silicone Application -
2025/06 R1F polyurea protective layer application -
2025/06 R1F Ironwork Construction
-
-
07
2025
-
2025/07 10F balcony hanging pipe construction -
2025/07 11F fire protection pipe room construction -
2025/07 18F staircase hall wall tile construction -
2025/07 21F Ironwork Silicone Application -
2025/07 22F paint batching -
2025/07 22F fireproof filling construction -
2025/07 23F glass installation -
2025/07 4F self-leveling construction -
2025/07 8F indoor electric cable -
2025/07 R1F Scaffolding Disassembly
-
-
08
2025
-
2025/08 11F gas piping works 02 -
2025/08 17F scaffolding dismantling 01 -
2025/08 18F stair hall wall tile installation 01 -
2025/08 18F metalwork silicone sealing 03 -
2025/08 18F scaffolding dismantling 02 -
2025/08 22F stair hall wall tile installation 05 -
2025/08 3F indoor electrical wiring 01 -
2025/08 3F door & window protective film removal 01 -
2025/08 7F ceiling board installation 01 -
2025/08 B1F MEP piping installation 01 -
2025/08 R1F landscaping brickwork 04
-
-
09
2025
-
2025/09 11F Brick Tile & Scaffolding 02 -
2025/09 11F Elevator Lobby Floor Tile 04 -
2025/09 11F Metal Work Finishing 01 -
2025/09 18F Ceiling Aggregate 01 -
2025/09 20F Drainage Pipe Installation 02 -
2025/09 2F Stone Sealant 02 -
2025/09 6F Ceiling Board Installation 01 -
2025/09 6F Paint Touch-up 01 -
2025/09 7F Ceiling Board Installation 02
-
-
10
2025
-
2025/10 17F Elevator Lobby Floor Tile Installation 01 -
2025/10 18F Elevator Lobby Floor Tile Grouting 01 -
2025/10 21F Ceiling Board Sealing 05 -
2025/10 23F Ceiling Opening Work 02 -
2025/10 2F Ceiling Putty Application 01 -
2025/10 2F Stone Silicone Sealing 01 -
2025/10 3F Metal Cladding Installation 01 -
2025/10 3F Metal Cladding Installation 03 -
2025/10 4F Brick Tile Installation 02 -
2025/10 4F Brick Tile Installation 03 -
2025/10 R1F Insulation Board Installation 02
-