Centre for the Future
-
05
2022
-
2022/05 Worship
-
2022/05 Worship
-
2022/05 Worship
-
2022/05 Worship
-
2022/05 Worship
-
-
06
2022
-
2022/06 casing
-
2022/06 casing
-
2022/06 casing
-
2022/06 casing
-
2022/06 casing
-
2022/06 casing
-
2022/06 casing
-
-
07
2022
-
2022/07 Earth excavation
-
2022/07 Earth excavation
-
2022/07 Earth excavation
-
2022/07 Construction of anti-floating piles
-
2022/07 Construction of anti-floating piles
-
2022/07 Construction of anti-floating piles
-
-
08
2022
-
2022/08 Earth excavation
-
2022/08 Earth excavation
-
2022/08 Earth excavation
-
2022/08 retaining wall
-
2022/08 retaining wall
-
2022/08 retaining wall
-
2022/08 retaining wall
-
2022/08 retaining wall
-
-
09
2022
-
2022/09 Earth excavation
-
2022/09 Earth excavation
-
2022/09 Earth excavation
-
2022/09 retaining column
-
2022/09 retaining column
-
2022/09 retaining column
-
2022/09 retaining column
-
2022/09 retaining column
-
-
10
2022
-
2022/10 middle pile
-
2022/10 middle pile
-
2022/10 middle pile
-
2022/10 middle pile
-
2022/10 retaining column
-
2022/10 retaining column
-
2022/10 retaining column
-
-
11
2022
-
2022/11 Intermediate pile construction
-
2022/11 Intermediate pile construction
-
2022/11 Intermediate pile construction
-
2022/11 First layer of horizontal support construction
-
2022/11 First layer of horizontal support construction
-
2022/11 First layer of horizontal support construction
-
-
12
2022
-
2022/12 Earth excavation
-
2022/12 Earth excavation
-
2022/12 Earth excavation
-
2022/12 Second layer of horizontal support construction
-
2022/12 Second layer of horizontal support construction
-
2022/12 Second layer of horizontal support construction
-
-
01
2023
-
2023/01 Earth excavation
-
2023/01 Earth excavation
-
2023/01 Earth excavation
-
2023/01 Earth excavation
-
2023/01 The third layer of support construction
-
2023/01 The third layer of support construction
-
2023/01 The third layer of support construction
-
-
02
2023
-
2023/02 Lower retaining column
-
2023/02 Lower retaining column
-
2023/02 Lower retaining column
-
2023/02 Lower retaining column
-
2023/02 Earth excavation
-
2023/02 Earth excavation
-
2023/02 Earth excavation
-
2023/02 Earth excavation
-
-
04
2023
-
2023/04 B3FL beam template assembly
-
2023/04 B4FL version steel bar binding
-
2023/04 B4FL version steel bar binding
-
2023/04 B4F column wall formwork assembly
-
2023/04 B4F column wall steel bar binding
-
2023/04 B4F column wall steel bar binding
-
-
05
2023
-
2023/05 B3FL beam plate pouring
-
2023/05 B3FL beam version steel bar binding
-
2023/05 B3FL beam version steel bar binding
-
2023/05 B3F column wall formwork assembly
-
2023/05 B3F column wall steel bar binding
-
2023/05 B3F beam template assembly
-
-
06
2023
-
2023/06 B1FL beam template assembly
-
2023/06 B1FL beam version steel bar binding
-
2023/06 B1FL beam version steel bar binding
-
2023/06 B2F column wall formwork assembly
-
2023/06 B2F column wall formwork assembly
-
2023/06 B2F column wall steel bar binding
-
-
07
2023
-
2023/07 B1F column wall formwork assembly
-
2023/07 B1F column wall steel bar binding
-
2023/07 B1F column wall steel bar binding
-
2023/07 B1F column wall steel bar binding
-
2023/07 B1F column wall steel bar binding
-
-
08
2023
-
2023/08 1FL column wall steel bar binding
-
2023/08 1FL tree hole hanging formwork
-
2023/08 1FL water and electricity piping
-
2023/08 1FL version of steel bar binding
-
2023/08 1FL version of steel bar binding
-
2023/08 1FL reserved steel bar binding
-
2023/08 Panoramic photo of the base
-
-
09
2023
-
2023/09 1F column torsion test
-
2023/09 1F column wall formwork assembly
-
2023/09 1F column wall formwork assembly
-
2023/09 1F column wall steel bar binding
-
2023/09 Panoramic photo of the base
-
-
10
2023
-
2023/10 2FL water and electricity piping
-
2023/10 2FL water and electricity piping
-
2023/10 2FL steel bar binding
-
2023/10 2FL steel bar binding
-
2023/10 Aerial shot of the south side
-
2023/10 Aerial shot of the east side
-
-
11
2023
-
2023/11 2F column wall formwork assembly
-
2023/11 3FL beam template assembly
-
2023/11 3F column wall formwork assembly
-
2023/11 4FL beam template assembly
-
2023/11 Aerial photos of the entire area
-
-
12
2023
-
2023/12 4F steel column wall binding
-
2023/12 4F scaffold lifting outer frame
-
2023/12 5FL beam version water and electricity piping
-
2023/12 5FL elevation device installation
-
2023/12 5F column wall formwork assembly
-
2023/12 Panoramic photo of the base
-
-
01
2024
-
2024/01 7FL formwork beam assembly
-
2024/01 7FL steel beam version lashing
-
2024/01 7F formwork column and wall assembly
-
2024/01 Polishing the roof of the second underground floor
-
2024/01 Polishing the roof of the second underground floor
-
2024/01 Polishing the roof of the second underground floor
-
2024/01 Panoramic photo of the base
-
-
02
2024
-
2024/02 7F stair placement
-
2024/02 8FL formwork beam assembly
-
2024/02 8FL formwork beam assembly
-
2024/02 8F water and electricity column wall piping
-
2024/02 8F scaffold outer frame lifting frame
-
2024/02 Panoramic photo of the base
-
-
03
2024
-
2024/03 10F column wall steel bar binding
-
2024/03 2F indoor fire pipe installation
-
2024/03 9FL RC pouring
-
2024/03 9F vibration wall construction
-
2024/03 Photos of the current appearance of the entire area
-
2024/03 Aerial photos of the current situation in the area
-
-
04
2024
-
2024/04 11FL beam plate assembly and construction
-
2024/04 11F column wall formwork assembly
-
2024/04 12FL beam version steel bar binding
-
2024/04 2F aluminum vertical window
-
2024/04 3F clay production package
-
2024/04 3F light compartment sealing single sided mold
-
2024/04 3F aluminum vertical window
-
2024/04 7F fire pipe installation
-
-
05
2024
-
2024/05 13FL formwork beam assembly
-
2024/05 13FL water and electricity beam version stakeout
-
2024/05 B3F primer brush
-
2024/05 Connector torque test
-
-
06
2024
-
2024/06 14FL beam version steel bar binding
-
2024/06 14F column main rib extension
-
2024/06 2F light compartment for soil collection
-
2024/06 4F light partition single-sided module stand
-
2024/06 8F Indoor floor top soil batching
-
-
07
2024
-
2024/07 17FL beam version steel bar binding
-
2024/07 17FL grouting front beam plate cleaning
-
2024/07 4F metal door installation
-
2024/07 5F light partition installation
-
2024/07 8F aluminum window installation and execution
-
2024/07 9F water and electricity indoor wiring
-
2024/07 B1F wall plaster application
-
-
08
2024
-
2024/08 12F fire hanging pipe construction
-
2024/08 18FL beam version steel bar binding
-
2024/08 19F column wall formwork assembly
-
2024/08 2F wall plaster work
-
2024/08 5F light compartment for soil batching
-
2024/08 5F aluminum window construction
-
2024/08 5F door and window seams
-
2024/08 7F metal door installation
-
-
09
2024
-
2024/09 11F aluminum window construction
-
2024/09 15F fire hanging pipe
-
2024/09 16F paint roof
-
2024/09 21FL beam version steel bar binding
-
2024/09 22FL beam version steel bar binding
-
2024/09 5F interior mud work
-
2024/09 7F light partition grouting
-
2024/09 9F light partition installation
-
-
10
2024
-
2024/10 10F door and window seams
-
2024/10 12F light partition single side
-
2024/10 12F light compartment with double seal
-
2024/10 12F light compartment with double seal
-
2024/10 15F drainage pipe
-
2024/10 22F column wall steel bar binding
-
2024/10 4F interior mud work
-
2024/10 5F interior mud work
-
-
11
2024
-
2024/11 6F indoor mud work
-
2024/11 10F light partition grouting
-
2024/11 11F indoor mud work
-
2024/11 11F door and window seams
-
2024/11 14F light compartment with seal
-
2024/11 14F metal door installation
-
2024/11 16F indoor pull cord
-
2024/11 3F indoor paint batching
-
2024/11 3F bathroom tiles
-
2024/11 5F bathroom waterproof
-
2024/11 6F indoor mud work
-
-
12
2024
-
2024/12 11F indoor mud work
-
2024/12 15F indoor mud work
-
2024/12 17F metal door stand frame
-
2024/12 20F aluminum window stand frame
-
2024/12 24F roof paint and soil
-
2024/12 6F indoor paint batching
-
2024/12 7F exterior plaster work
-
2024/12 7F indoor paint batching
-
2024/12 7F kitchen tiles
-
2024/12 8F light compartment for soil batching
-