Fortune
-
12
2021
-
2021/12 Worship
-
2021/12 Worship
-
-
01
2022
-
2022/01 Month continuous wall unit A12
-
2022/01 Continuous wall unit A12 grouting
-
2022/01 Construction of continuous wall
-
-
02
2022
-
2022/02 stakeout
-
2022/02 Intermediate pile driving
-
-
03
2022
-
2022/03 First layer excavation work
-
2022/03 First floor support erection
-
2022/03 Excavation work on the second floor
-
-
04
2022
-
2022/04 Third layer support erection
-
2022/04 Excavation work on the second floor
-
2022/04 Second floor support erection
-
-
05
2022
-
2022/05 Excavation work on the fourth floor
-
2022/05 Raft foundation steel bar lashing
-
2022/05 Excavation completion surface preparation work
-
-
06
2022
-
2022/06 B3FL template assembly
-
2022/06 B3F steel bar binding
-
-
07
2022
-
2022/07 B1F lane steel tying
-
2022/07 B2FL steel bar tying
-
-
08
2022
-
2022/08 B1FL steel bar binding
-
2022/08 Support removal operations
-
-
09
2022
-
2022/09 1FL鋼筋綁紮
-
2022/09 Column steel bar binding
-
-
10
2022
-
2022/10 1F template assembly
-
2022/10 1F template assembly for the whole area
-
-
11
2022
-
2022/11 2FL steel bar binding
-
2022/11 2FL template assembly
-
-
12
2022
-
2022/12 3FL RC
-
2022/12 3F column reinforcement torsion test
-
2022/12 3F wall reinforcement binding
-
2022/12 4FL version of tendon binding
-
2022/12 4FL water and electricity piping
-
2022/12 4FL version of tendon binding
-
2022/12 4FL version of tendon binding
-
2022/12 Torque test of 4F column reinforcement connection
-
2022/12 Torque test of 4F column reinforcement connection
-
-
01
2023
-
2023/01 5F column reinforcement binding
-
2023/01 5F column connector test
-
2023/01 5F water and electricity wall piping
-
2023/01 5F wall module installation
-
2023/01 5F wall reinforcement binding
-
2023/01 6FL beam and plate lashing
-
2023/01 6FL beam and plate lashing
-
2023/01 Layout cleaning operations
-
-
02
2023
-
2023/02 6FL RC
-
2023/02 7FL RC
-
2023/02 7FL Architect Check
-
2023/02 7FL beam plate lashing
-
2023/02 7FL beam version assembly
-
2023/02 7F column bar connector torque test
-
-
03
2023
-
2023/03 8F column bar torsion test
-
2023/03 9FL architect inspection before grouting
-
2023/03 9FL water and electricity piping
-
2023/03 9FL water and electricity piping
-
2023/03 9FL steel bar binding
-
2023/03 9FL steel bar binding
-
2023/03 9FL steel bar binding
-
-
04
2023
-
2023/04 10FL technician inspection
-
2023/04 10F column bar binding project
-
2023/04 10F wall reinforcement binding project
-
2023/04 3F indoor light partition
-
2023/04 B1F indoor mud work
-
2023/04 Taking photos from the north of the base
-
-
05
2023
-
2023/05 Aerial photo of 11F base
-
2023/05 south)
-
2023/05 11F column bar connector test
-
2023/05 11F column bar spacing inspection
-
2023/05 12FL technician inspection
-
2023/05 Installation of sealing board for 2F light partition
-
2023/05 Thumbs
-
-
06
2023
-
2023/06 13FL RC Tamping
-
2023/06 13FL plate reinforcement binding
-
2023/06 13FL beam plate assembly
-
2023/06 13FL beam reinforcement binding
-
2023/06 14FL beam plate assembly
-
2023/06 6F light partition sealing plate
-
-
07
2023
-
2023/07 Torque test
-
2023/07 Technician inspection
-
2023/07 Mudwork - Exterior Mudwork
-
2023/07 Mudwork-Indoor Mudwork
-
2023/07 Light partition-soil batching
-
2023/07 Steel bars-bar binding
-
-
08
2023
-
2023/08 Base exterior photo
-
2023/08 Torque test
-
2023/08 Mudwork - Exterior Mudwork
-
2023/08 Pink light-R1FL
-
2023/08 Light Partition - Grouting
-
2023/08 Light cubicle-skeleton standing
-
-
09
2023
-
2023/09 R2FL steel bar binding
-
2023/09 Exterior wall tiles-erding hanging
-
2023/09 Indoor clay work
-
2023/09 bathroom wall tiles
-
2023/09 Aerial shot
-
2023/09 Light partition-sealed version
-
2023/09 Aluminum doors and windows
-
-
10
2023
-
2023/10 R3FL formwork beam assembly and elevator setting out
-
2023/10 Rectangular Tile hanging sew
-
2023/10 Rectangular Tile
-
2023/10 Appearance photos
-
2023/10 Interior paint batching
-
2023/10 Roof steel bar binding
-
2023/10 Light cubicle-skeleton standing
-
-
11
2023
-
2023/11 Hanging pipe-basement hanging pipe
-
2023/11 Floor tiles-stair tiles
-
2023/11 Paint - paint batching soil
-
2023/11 Paint - paint batching soil
-
2023/11 Light partition - sealing between pipes
-
2023/11 Light cubicle-skeleton standing
-
-
12
2023
-
2023/12 Base exterior photo
-
2023/12 Exterior wall Rectangular Tile
-
2023/12 Exterior marble
-
2023/12 stair tiles
-
2023/12 bathroom wall tiles
-
2023/12 Light compartment double-sided sealing plate
-
2023/12 balcony floor tiles
-
-
01
2024
-
2024/01 Exterior wall Rectangular Tile
-
2024/01 Exterior wall grille construction
-
2024/01 Elevator hall ceiling skeleton construction
-
2024/01 gas pipe work
-
2024/01 Soil batching in light compartments
-
2024/01 balcony floor tiles
-
-
02
2024
-
2024/02 14F15F light compartment double seal
-
2024/02 toilet floor tiles
-
2024/02 toilet ceiling
-
2024/02 kitchen ceiling
-
2024/02 Aluminum grille
-
2024/02 balcony floor tiles
-
-
03
2024
-
2024/03 RF gas main pipe construction
-
2024/03 Exterior wall Rectangular Tile
-
2024/03 Installation of exterior wall smoke hood
-
2024/03 Toilet Soft Floor Construction
-
2024/03 Kitchen ceiling paint patch
-
2024/03 Balcony soft bottom construction
-
-
04
2024
-
2024/04 B1F pipe hanging installation
-
2024/04 Appearance photo
-
2024/04 Appearance photo
-
2024/04 Appearance photo
-
2024/04 Appearance photo
-
2024/04 Interior floor tile installation
-
2024/04 Indoor soil preparation
-
2024/04 Installation of stair floor tiles
-
2024/04 Bathroom wall tile installation
-
2024/04 Bathroom wall tile installation
-
2024/04 Balcony floor tiles
-
-
05
2024
-
2024/05 15F toilet soft bottom construction
-
2024/05 15F balcony soft bottom construction
-
2024/05 RF water testing operation
-
2024/05 Marble basin installation
-
-
06
2024
-
2024/06 3F~15F stair hall floor tile installation
-
2024/06 Building A kitchen cabinet installation
-
2024/06 Marble countertop installation in Building B
-
2024/06 R1F Horticulture
-
2024/06 Basic grouting of the tree hole on the east side of 1F
-
-
07
2024
-
2024/07 1F fireproof covering
-
2024/07 RF horticulture
-
2024/07 exterior wall cleaning
-
2024/07 Installation of elevator hall equipment
-
2024/07 Bathroom ceiling paint application
-
2024/07 driveway ceiling grille
-
-
08
2024
-
2024/08 Horticulture
-
2024/08 Plastic wood platform construction
-
2024/08 Floor tiles
-
2024/08 Interior spray painting
-
2024/08 Interior spray painting
-
2024/08 indoor cleaning
-
2024/08 driveway tiling
-
2024/08 fireproof caulking
-
-
09
2024
-
2024/09 1F Horticulture
-
2024/09 1F pillar wall marble construction
-
2024/09 2F~15F wooden door frame paint application
-
2024/09 Installation of tiles in elevator halls B1F~B3F
-
2024/09 Installation of tiles in elevator halls B1F~B3F
-
2024/09 RF landscape lighting installation
-
2024/09 Installation of fresh air fans for each household
-
2024/09 indoor cleaning
-
2024/09 Fire safety inspection
-
2024/09 Fire safety inspection
-
-
10
2024
-
2024/10 basement paint
-
2024/10 basement paint
-
2024/10 Indoor silicone
-
2024/10 Wooden door leaf installation
-
2024/10 Lighting Plan
-
-
11
2024
-
2024/11 EPOXY
-
2024/11 EPOXY
-
2024/11 EPOXY
-
2024/11 Public decoration construction
-
2024/11 Interior painting finishing touches
-
2024/11 Indoor silicone application
-
2024/11 Telecom cabinet weak current
-
-
12
2024
-
2024/12 10F indoor fine clarity
-
2024/12 Installation of the 1F public hall
-
2024/12 1F public hall decoration
-
2024/12 1F public guy wire
-
2024/12 1F Mom’s Classroom Kitchenware Installation
-
2024/12 3F interior paint
-
2024/12 6F indoor fine detail
-
2024/12 7F elevator hall cleaning
-
2024/12 8F interior paint
-
2024/12 B1F Taipower wiring
-
2024/12 B1F Taipower wiring
-
2024/12 B2F EPOXY
-