Metro Building
-
04
2022
-
2022/04 5FL Hydropower stakeout
-
2022/04 5FL beam version steel bar binding
-
-
05
2022
-
2022/05 6FL formwork paving completed
-
2022/05 6FL beam version steel bar binding
-
-
06
2022
-
2022/06 8FL beam version steel bar binding
-
2022/06 8FL grouting operation
-
-
07
2022
-
2022/07 9FL layout steel bar and piping work
-
2022/07 9F Construction rack elevating operation
-
2022/07 9F Column bar continuation operation
-
-
08
2022
-
2022/08 Roof plate washing and garbage cleaning before grouting
-
2022/08 Building A roof panel grouting
-
-
09
2022
-
2022/09 11FL beam plate, water and electricity work completed
-
2022/09 11FL Grouting completed
-
2022/09 Waterproofing of the atrium terrace
-
-
10
2022
-
2022/10 4F light compartment grouting
-
2022/10 5F aluminum door and window seams
-
2022/10 B2F peripheral exterior wall primer construction
-
-
11
2022
-
2022/11 2F Exterior wall primer construction
-
2022/11 Stone construction in the lobby of Building BC
-
2022/11 Interior wall light partition layout
-
2022/11 Base Appearance
-
2022/11 Base Appearance
-
-
12
2022
-
2022/12 facade
-
2022/12 facade
-
2022/12 facade
-
2022/12 Hall stone wall construction
-
2022/12 Light compartment grouting
-
-
01
2023
-
2023/01 facade
-
2023/01 facade
-
2023/01 facade
-
2023/01 Formwork grouting for atrium and flower table
-
2023/01 Floor tile paving in public areas
-
2023/01 Bathroom wall tile installation
-
-
02
2023
-
2023/02 Installation of wall tiles in bathroom on 3F, Building DE
-
2023/02 Basement mechanical parking construction
-
-
03
2023
-
2023/03 5-6F exterior wall tile installation
-
2023/03 Elevator platform construction in Building D
-
-
04
2023
-
2023/04 Vestibule protection
-
2023/04 Balcony double hanging installation
-
2023/04 Elevator construction
-
-
05
2023
-
2023/05 Exterior wall double hanging installation
-
2023/05 Installation of wall tiles in staircase hall
-
2023/05 Balcony double hanging installation
-
-
06
2023
-
2023/06 11F fire pipe installation
-
2023/06 4F floor tile construction
-
2023/06 Installation of wall tiles in 4F staircase hall
-
2023/06 6F floor tile installation
-
-
07
2023
-
2023/07 Ceiling construction
-
2023/07 Construction of stair hall wall tiles
-
2023/07 Elevator construction
-
-
08
2023
-
2023/08 Atrium gardening construction
-
2023/08 Atrium floor tile construction
-
2023/08 Construction of public wall tiles
-
2023/08 Ceiling construction
-
-
09
2023
-
2023/09 Atrium planting
-
2023/09 gate construction
-
-
10
2023
-
2023/10 Atrium lighting test
-
2023/10 Exterior wall cleaning
-
2023/10 Shower sliding door installation
-
-
11
2023
-
2023/11 B3F EPOXY
-
2023/11 B3F EPOXY
-
2023/11 Exterior wall lighting test
-
-
12
2023
-
2023/12 Basement EPOXY installation
-
2023/12 Basement EPOXY installation
-
2023/12 Gas shut-off valve installation
-
-
01
2024
-
2024/01 Roof water supply construction
-
2024/01 Screen material
-